The Rajasthan state is poorly placed in terms of availability of water resources. It has only 1.16% of surface water and 1.70% of the ground water of the country. Average rainfall is 531 mm against national average of 1200 mm. Gross annual draft of ground water in the state is 13 BCM against recharge of 10.4 BCM.
Opportunities for Investors
Due to the water scarcity, Rajasthan is severely affected with drinking water supply problems. So to resolve this problem, Rajasthan Government has taken up execution of major drinking water supply projects in a big way and there lies excellent opportunities for investment in this sector.
The major drinking water supply projects, as proposed for private investment, are basically of two configurations:
Transmission
The transmission system intends to carry water from the raw water source to different pumping stations.
Cluster Distribution
The cluster distribution system projects involves taking off water from existing transmission systems and conveying it to different villages/habitations in the project area.
Major Water Supply Projects in Rajasthan
A number of major water supply projects have been identified for implementation under public private partnership model.
- Mansiwakal Water Supply Project for Udaipur
- Bisalpur Jaipur Water Supply Project
- Fluoride Control Project for Bhinay-Masooda
- Jawai-Pali Pipeline Project
- Barmer Lift Canal Water Supply Project
- Bisalpur Dudu Phulera Project
- Madhopur -Baler Water Supply Project
- Churu-Jhunjhunu Water Supply Project Phase-II (Aapni Yojana)
- Sarwar-Nasirabad Pipeline Project
Government Initiatives
Rajasthan has demanded special status in terms of drinking water supply while pointing out that the desert State needs Rs.50,000 crore for supply of clean and safe potable water to the remote areas, including Rs.20,000 crore for projects presently under way.
The Rajasthan Government’s Public Health Engineering Department (PHED) has installed over 10,700 new hand-pumps and bore-wells in the State’s urban as well as rural areas this past January under a contingency plan for supply of drinking water.
#1 by harshvardhan on July 30, 2010 - 10:13 pm
Quote
the matter available in here is not sufficient………plz give details of all the profects
#2 by Rudradeo Kashyap on January 18, 2012 - 12:55 pm
Quote
APPEAL
please conect all rivers of earth by sea and pipeline success for “gaurenteed water supply system in world by sea”.
project report of Ever-flowing rivers manufacturers project report.
all Thinkers and countries owners president of world govt. request by me for do you help this project report for non irrigated area water supply system in world by sea.
thanks…
Example:
1. irrigated area- odisa, chhattisgarh, Andhra Pradesh : sea to indrawati river pipe line
system.
2. irrigated area- odisa, chhattisgarh: indrawati to mahanadi river pipe line.
3. irrigated area- Madhya Pradesh, gujrat, jhharkhand, bihar, west Bengal: mahanadi to
narmada, son, ganga river pipe line. Mahanadi to narmada, son pipe line.
Highlight:
Prafit :
1. 24 hours water supply project report for irrigated area.
2. Agricultural employment would create billions in days.
3. no Famine potision any time in irrigated area
4. Rivers needs to go on forever will be in position.
5. Production development, tax development, and create Prosperity of the people.
Loss :
1. Heavy charges of water treatment plant. as a chennai (india) water treatment plant .
700000000 ruppeese charges.
2. Heavy charges for pipeline fitings.
3. maintenance charges.
4. havy electical pump for water lift.
Signal:
1. Distance: Distance of pipe line 1 hundred kelometer about.
2. hight: 1ooo meter about for lift.
3. Cost: one water treatment plant charge seven Billion ruppeese
4. capisity: 32 crore liter drinking water per day by sea and one treatment plant.
Introduction of Appellant
Name : Rudradeo Kashyap
Village : Saiha
Post : Champa pin no. 493332
Tehsil : Pallari , Dist: Baloda Bazar , Chhattisgarh, India.
Mobile No. : 09303834219, 9617345322, 08889006191, 08962715450
E-mail : [email protected]
[email protected]
Date of birth : 19-05-1952
Education : Higher secondary school eaxamination passed in 1972 in m.p. h.s.c. board.
Special enterest : rendition Memorize of Srimdbgvdgeeta Sanskrit and Hindi language.